Home » Projects » Wombwell

Wombwell

Barnsley

BISF steel framed properties were insulated with the Alumasc swisspan system – using galvanised steel rails fixed to the main structure – eliminating the need to strip off the existing cladding saving time and landfill.

Ninety houses were completed in 21 weeks.

2007 INCA award winner: Best use of insulated render and cladding for residential low rise / refurbishment.


After

After:

« Back to all projects